| |||||||||||
|
Welcome!
Welcome to the Las Palmas Estates Homeowners Association's webpage. We are located in Placentia, California.
Thursday, October 16, 2014
OC Bridges Update 10/16
Monday, September 8, 2014
OC Bridges Update
This is the email I received today from the OCTA.
I've cut and paste the news for Orangethrope and Tustin/Rose. Click the link above to see the entire email.
I've cut and paste the news for Orangethrope and Tustin/Rose. Click the link above to see the entire email.
Orangethorpe Avenue Overcrossing
- Contractor closed through traffic on Orangethorpe Avenue on August 11, 2014
- Temporary sound blankets were installed
- Pile driving activity began and will continue until estimated completion in late November
- Continue clearing of trees and groundcover at Chapman Avenue and Orangethorpe Avenue
Tustin Avenue / Rose Drive Overcrossing
- Contractor is preparing bypass road for opening in mid September including:
- Paving and striping
- Installation of traffic signals
- Completion of property tie-ins within Del Cerro Mobile Estates
Please remember you can follow construction progress on the individual project pages at the OC Bridges website. Please visit www.ocbridges.com. (Click on the individual project page, scroll to the bottom and watch the daily progress)
OCTA and BNSF are closely coordinating their construction activities; however, OCTA cannot direct the time and duration of BNSF activities.
Disclaimer: Due to unforeseen operational factors or inclement weather, dates and times may change. If you would like to be removed from this list, please send an e-mail to:ocbridges@octa.net.
If you have any questions about this notification or other project issues, please contact:
Tresa Oliveri, Outreach Project Manager, (714) 560-5374 or toliveri@octa.net or see below for additional options to "Get Connected/Stay Connected."
OCTA and BNSF are closely coordinating their construction activities; however, OCTA cannot direct the time and duration of BNSF activities.
Disclaimer: Due to unforeseen operational factors or inclement weather, dates and times may change. If you would like to be removed from this list, please send an e-mail to:ocbridges@octa.net.
Thursday, August 28, 2014
Notice to Las Palmas Estates Residents
24 July 2014 (sorry I'm really behind here)
Subject: Slope behind homes on Curie Lane
Our neighbors at the Bella Vista complex have informed us that their gardeners are finding trash and landscape clippings from trees and plants being thrown over our perimeter wall onto their slope area. Their landscape crew needs the area behind our perimeter wall to be clear for them to perform the slope maintenance. The Bella Vista Landscape crew will have to deal with that part of the issue.
The reason for this is that their landscape crews need the area directly behind our perimeter walls to be clear of clutter for them to perform their slope maintenance.
We will send out the LPEHOA landscape crew out to pick-up what has been dumped. This is a onetime effort by LPEHOA!
Any other clippings beyond the point of this notice will then become the responcibility of the homeowner(s) to remove.
Please note: Some of the shrubs and treees are well over the wall and require trimming by the individual homeowners.
Thank you in advance for your attention to this matter,
Las Palmas Estates HOA
Subject: Slope behind homes on Curie Lane
Our neighbors at the Bella Vista complex have informed us that their gardeners are finding trash and landscape clippings from trees and plants being thrown over our perimeter wall onto their slope area. Their landscape crew needs the area behind our perimeter wall to be clear for them to perform the slope maintenance. The Bella Vista Landscape crew will have to deal with that part of the issue.
The reason for this is that their landscape crews need the area directly behind our perimeter walls to be clear of clutter for them to perform their slope maintenance.
We will send out the LPEHOA landscape crew out to pick-up what has been dumped. This is a onetime effort by LPEHOA!
Any other clippings beyond the point of this notice will then become the responcibility of the homeowner(s) to remove.
Please note: Some of the shrubs and treees are well over the wall and require trimming by the individual homeowners.
Thank you in advance for your attention to this matter,
Las Palmas Estates HOA
Pool Drawing Set w/ Site Plan for Review
We got some drawings from the architect regarding the pool area remodel.
Click on each link to view the picture.
Click on each link to view the picture.
OC Bridges Update
OCTA contacted us with some updates, some of which I'm sure you are already experiencing.
This is directly from the handout. (sorry I don't have a scanner handy)
August 2014-Spring 2016
Orangethorpe Ave Road Closure
OCTA previously planned for the bridge to be built while Orangethorpe remained open via a bypass road with one lane in both directions. However, complex utility relocations have affected the construction schedule. In order for the project to remain on schedule for completion by spring 2016, Orangethorpe Ave will be fully closed while the bridge is under construction. Starting early 2015, access to Chapman Ave will be closed until approximately late 2015.
Drivers can use either Kraemer Blvd to the west or Tustin/Rose to the east, with Alta Vista St to the north and Miraloma to the south, as detour routes.
For more information:
Tresa Oliveri
OC Bridges Outreach Manager
toliveri@octa.net
714-560-5374
OCTA
550 S. Main St.
P.O. Box 14184
Orange CA 92863
The Board met with Tresa and voiced many of our concerns. She was supposed to get back to us with some answers soon. If you have concerns, please let us know and/or let Tresa know.
And here are the notes that Lynne Waterson (our board secretary) took from our meeting with Tresa.
Will give updates as and when available. Can go on website and check updates.
This is directly from the handout. (sorry I don't have a scanner handy)
August 2014-Spring 2016
Orangethorpe Ave Road Closure
OCTA previously planned for the bridge to be built while Orangethorpe remained open via a bypass road with one lane in both directions. However, complex utility relocations have affected the construction schedule. In order for the project to remain on schedule for completion by spring 2016, Orangethorpe Ave will be fully closed while the bridge is under construction. Starting early 2015, access to Chapman Ave will be closed until approximately late 2015.
Drivers can use either Kraemer Blvd to the west or Tustin/Rose to the east, with Alta Vista St to the north and Miraloma to the south, as detour routes.
For more information:
Tresa Oliveri
OC Bridges Outreach Manager
toliveri@octa.net
714-560-5374
OCTA
550 S. Main St.
P.O. Box 14184
Orange CA 92863
The Board met with Tresa and voiced many of our concerns. She was supposed to get back to us with some answers soon. If you have concerns, please let us know and/or let Tresa know.
And here are the notes that Lynne Waterson (our board secretary) took from our meeting with Tresa.
Schedule is behind. Delays in relocating utility lines
Bypass road not being utilized now, alternative close Orangethorpe Avenue
Until 2016, starting early August.
Chapman Avenue open until January 2015 then closed for 9 months to a year.
August 11th sound blanket structure on Orangethorpe starting
OCTA own the whole project until completion then turned over to the City of Placentia.
Will give updates as and when available. Can go on website and check updates.
Monday, May 12, 2014
Pool Elevation Drawings
Here are some drawings from the architect for our new pool house and pool area.
Click on the link to view any of the drawings. Sorry if they are upside down.
Drawings are as follows:
1) New vs Old-Overlay 030114
1) New Layout Only 031014
1) Section View "Imagine it Cut in Half at the entry doors" 032714
Click on the link to view any of the drawings. Sorry if they are upside down.
Drawings are as follows:
1) New vs Old-Overlay 030114
1) New Layout Only 031014
1) Section View "Imagine it Cut in Half at the entry doors" 032714
Update
Minutes from the March 28th and May 1 meetings are up! Click on Board Meeting Minutes on the right to find them!
The next board meeting is scheduled for May 29th at 7 pm at the pool. Please attend!
The day and times for the board meetings has changed, please click on Board Meeting Dates on the right for more information.
The next board meeting is scheduled for May 29th at 7 pm at the pool. Please attend!
The day and times for the board meetings has changed, please click on Board Meeting Dates on the right for more information.
Subscribe to:
Posts (Atom)



