OC Bridges Construction Notification, November 13, 2014

CONSTRUCTION NOTIFICATION
November 13, 2014
The Orange County Transportation Authority is building a series of bridges to separate trains from vehicles along the BNSF corridor in Fullerton, Placentia and Anaheim. In accordance with federal railroad safety regulations, residents should expect to hear an increase in the frequency of train horns because of construction activities on and around the railroad tracks, regardless of quiet zone designation.
Regular work hours are Monday through Saturday, 7 a.m. to 8 p.m.
Placentia Avenue Undercrossing                                                            
  • Testing pump station equipment
  • OCTA anticipates the contractor will complete work activities by end of the month; however, there will be a two-year plant acceptance period
Kraemer Boulevard Undercrossing                                                         
  • Contractor completing remaining punch list items  
    • Contractor to submit maintenance manual and warranties
    • OCTA anticipates the contractor will complete work activities by end of the month; however, there will be a two-year plant acceptance period
    Orangethorpe Avenue Overcrossing                                                      
    • Pile driving continues with contarctor making good progress towards completing activity before Thanksgiving Day
    • Continued work to tie 72" waterline to existing service
    • Relocation of Davis Way entrance/exit expected to begin next month
    • Contractor is on schedule to complete necessary activities in preparation to close Chapman Avenue where it connects to Orangethorpe Avenue in January

    Orangethorpe_Looking at Ornagehorpe Avenue Crossing 1
     
    Tustin Avenue / Rose Drive Overcrossing                                              
    • Southern California Edison to install light foundation at Orangethorpe Avenue west of Rose Drive  
      • Begin the embankment for bridge approaches on both north and south side of Tustin Avenue
      • Begin major grading on Tustin Avenue and Rose Drive
      Lakeview Avenue Overcrossing                                                                             
      • Work began on underground conduits for new signal at Highland Avenue and Orangethorpe Avenue    
      • Utility companies continue relocation of services for gas and electricity service 
      • Contractor moving forward with relocation of water service for the City of Anaheim and Yorba Linda Water District customers    
      • Due to nature of water service relocations, contractor will work during evening hours in several locations within project limits  
      • Drivers are encouraged to drive slowly and to carefully observe the changes to lane access for their safety as well as the safety of the construction teams    
           
      State College Boulevard Undercrossing                                                  
      • Utility companies (Time Warner Cable and AT&T) continue their service with relocation activities
      • Preparation for sewer service relocation under Kimberly Avenue continues
      • Temporary storm drain line along railroad property underway
      • Construction of temporary driveway to CJ Foods upcoming
      • Contractor is on track to close State College Boulevard in January as planned
        Please remember you can follow construction progress on the individual project pages at the OC Bridges website.  Please visit www.ocbridges.com.   (Click on the individual project page, scroll to the bottom and watch the daily progress)
        If you have any questions about this notification or other project issues, please contact:
        Tresa Oliveri, Outreach Project Manager, (714) 560-5374 or toliveri@octa.net or see below for additional options to "Get Connected/Stay Connected."

        OCTA and BNSF are closely coordinating their construction activities; however, OCTA cannot direct the time and duration of BNSF activities. 

        Disclaimer: Due to unforeseen operational factors or inclement weather, dates and times may change.  If you would like to be removed from this list, please send an e-mail to:ocbridges@octa.net.

        Friday, November 7, 2014

        Call for Candidates!

        If you would like to run for a position on the association board, please fill out the nomination form and return by December 15th.
        Ballots will be mailed out after December 15th.

        Mail the form to:
        Las Palmas Estates Homeowners Association
        C/O CMC Community Management Company
        2740 N. Grand Ave. Suite 200 
        Santa Ana CA 92705


        Friday, October 31, 2014

        Annual General Meeting Date Change!

        The new date for the annual general meeting will be February 28, 2015 at 2 PM at the pool.

        Also, there will be a call for HOA board member candidates coming soon, please check your mailers if you are interested in nominating yourself or someone else. Voting will follow nominations.

        Thursday, October 16, 2014

        OC Bridges Update 10/16

        ONSTRUCTION NOTIFICATION
        October 16, 2014
        The Orange County Transportation Authority is building a series of bridges to separate trains from vehicles along the BNSF corridor in Fullerton, Placentia and Anaheim. In accordance with federal railroad safety regulations, residents should expect to hear an increase in the frequency of train horns because of construction activities on and around the railroad tracks, regardless of quiet zone designation.
        Regular work hours are Monday through Saturday, 7 a.m. to 8 p.m.
        The following construction activities have either recently completed or are anticipated to begin shortly:­­­­­­­­­­­­­­­­­­­­­­­­
        Orangethorpe Avenue Overcrossing                                                        
        • Pile driving activities continue. Activity is on schedule to complete before the end of the year
        • 72" waterline installation continues
         Photo: Looking at Orangethorpe Avenue crossing
        Orangethorpe_Looking at Ornagehorpe Avenue Crossing 1
         
        Photo: Placing concrete for Abutment 2 on Orangethorpe Avenue bridge
        Tustin Rose_Time-lapse camera looking at Tustin-Rose intersection 2
         
         
         Tustin Avenue / Rose Drive Overcrossing                                               
        • Del Cerro Drive by-pass road opened to traffic on October 4, 2014. Drives are encouraged to observe the 25 mph speed limit  
          • Demolition of Tustin Avenue and Rose Drive roadways have begun
          • Temporary intersection signalization at Richfield Road and Mira Loma Avenue
          Lakeview Avenue Overcrossing                                                                            
          • 18" waterline work including bringing line under BNSF and Lakeview Avenue continues    
          • Installation of City of Anaheim 12" sewer line is underway 
          • Utility relocations continue    
          • Residents and drivers should be aware that starting Monday, October 20 at 9 pm through Friday, October 24 at 5 am, the contractor will reduce lanes on Orangethorpe Avenue in the area near the intersection with Lakeview Avenue to one lane in either direction. Drivers are encouraged to reduce their speed through the impacted area.  
          Photo: Time lapse camera on Lakeview Avenue looking northwest
          Lakeview_Jack and bore operation at Atwood Channel 3
           
          State College Boulevard Undercrossing                                                   
          • Installation of sewer line under the tracks at Kimberly Avenue has begun requiring lane reductions from Kimberly Avenue to Valencia Drive. These lane reductions will be in place until the end of the year.
          • Continue with railroad retaining walls
           Photo: Time lapse camera facing east at State College Boulevard
          Raymond Avenue_time lapse camera on site 4
           Raymond Avenue Undercrossing                                                             
          • Continue activity at east end of Valencia Drive near Fullerton Industrial Center
          • Continue 3rd party utility relocation
          • Begin pile driving activities along BNSF property
          Please remember you can follow construction progress on the individual project pages at the OC Bridges website.  Please visit www.ocbridges.com.   (Click on the individual project page, scroll to the bottom and watch the daily progress)
          If you have any questions about this notification or other project issues, please contact:
          Tresa Oliveri, Outreach Project Manager, (714) 560-5374 or toliveri@octa.net or see below for additional options to "Get Connected/Stay Connected."

          OCTA and BNSF are closely coordinating their construction activities; however, OCTA cannot direct the time and duration of BNSF activities. 

          Disclaimer: Due to unforeseen operational factors or inclement weather, dates and times may change.  If you would like to be removed from this list, please send an e-mail to:ocbridges@octa.net.

          Monday, September 8, 2014

          OC Bridges Update

          This is the email I received today from the OCTA.

          I've cut and paste the news for Orangethrope and Tustin/Rose. Click the link above to see the entire email.

          Orangethorpe  Avenue Overcrossing                                                        
          • Contractor closed through traffic on Orangethorpe Avenue on August 11, 2014
          • Temporary sound blankets were installed
          • Pile driving activity began and will continue until estimated completion in late November
          • Continue clearing of trees and groundcover at Chapman Avenue and Orangethorpe Avenue
          Tustin Avenue / Rose Drive Overcrossing                                               
          • Contractor is preparing bypass road for opening in mid September including:    
            • Paving and striping 
            • Installation of traffic signals
          • Completion of property tie-ins within Del Cerro Mobile Estates

          Please remember you can follow construction progress on the individual project pages at the OC Bridges website.  Please visit www.ocbridges.com.   (Click on the individual project page, scroll to the bottom and watch the daily progress)
          If you have any questions about this notification or other project issues, please contact:
          Tresa Oliveri, Outreach Project Manager, (714) 560-5374 or toliveri@octa.net or see below for additional options to "Get Connected/Stay Connected."

          OCTA and BNSF are closely coordinating their construction activities; however, OCTA cannot direct the time and duration of BNSF activities.

          Disclaimer: Due to unforeseen operational factors or inclement weather, dates and times may change.  If you would like to be removed from this list, please send an e-mail to:ocbridges@octa.net.

          Thursday, August 28, 2014

          Notice to Las Palmas Estates Residents

          24 July 2014 (sorry I'm really behind here)

          Subject: Slope behind homes on Curie Lane

          Our neighbors at the Bella Vista complex have informed us that their gardeners are finding trash and landscape clippings from trees and plants being thrown over our perimeter wall onto their slope area. Their landscape crew needs the area behind our perimeter wall to be clear for them to perform the slope maintenance. The Bella Vista Landscape crew will have to deal with that part of the issue.

          The reason for this is that their landscape crews need the area directly behind our perimeter walls to be clear of clutter for them to perform their slope maintenance. 

          We will send out the LPEHOA landscape crew out to pick-up what has been dumped. This is a onetime effort by LPEHOA!


          Any other clippings beyond the point of this notice will then become the responcibility of the homeowner(s) to remove.

          Please note: Some of the shrubs and treees are well over the wall and require trimming by the individual homeowners.

          Thank you in advance for your attention to this matter,

          Las Palmas Estates HOA

          Pool Drawing Set w/ Site Plan for Review

          We got some drawings from the architect regarding the pool area remodel.

          Click on each link to view the picture.

          OC Bridges Update

          OCTA contacted us with some updates, some of which I'm sure you are already experiencing.

          This is directly from the handout. (sorry I don't have a scanner handy)

          August 2014-Spring 2016

          Orangethorpe Ave Road Closure

          OCTA previously planned for the bridge to be built while Orangethorpe remained open via a bypass road with one lane in both directions. However, complex utility relocations have affected the construction schedule. In order for the project to remain on schedule for completion by spring 2016, Orangethorpe Ave will be fully closed while the bridge is under construction. Starting early 2015, access to Chapman Ave will be closed until approximately late 2015.

          Drivers can use either Kraemer Blvd to the west or Tustin/Rose to the east, with Alta Vista St to the north and Miraloma to the south, as detour routes.

          For more information:
          Tresa Oliveri
          OC Bridges Outreach Manager
          toliveri@octa.net
          714-560-5374

          OCTA
          550 S. Main St.
          P.O. Box 14184
          Orange CA 92863

          The Board met with Tresa and voiced many of our concerns. She was supposed to get back to us with some answers soon. If you have concerns, please let us know and/or let Tresa know.

          And here are the notes that Lynne Waterson (our board secretary) took from our meeting with Tresa.

          Schedule is behind. Delays in relocating utility lines
          Bypass road not being utilized now, alternative close Orangethorpe Avenue
          Until 2016, starting early August.
          Chapman Avenue open until January 2015 then closed for 9 months to a year.
          August 11th sound blanket structure on Orangethorpe starting
          OCTA own the whole project until completion then turned over to the City of Placentia.

          Will give updates as and when available. Can go on website and check updates.

          Monday, May 12, 2014

          Pool Elevation Drawings

          Here are some drawings from the architect for our new pool house and pool area.

          Click on the link to view any of the drawings. Sorry if they are upside down.

          Drawings are as follows:
          1) New vs Old-Overlay  030114
          1) New Layout Only       031014
          1) Section View "Imagine it Cut in Half at the entry doors"  032714


          Update

          Minutes from the March 28th and May 1 meetings are up! Click on Board Meeting Minutes on the right to find them!

          The next board meeting is scheduled for May 29th at 7 pm at the pool. Please attend!

          The day and times for the board meetings has changed, please click on Board Meeting Dates on the right for more information.

          Monday, March 3, 2014

          March Board Meeting Date

          The Las Palmas Estates HOA's next board meeting is scheduled for Friday, March 28th at 6pm. Location TBA. Everyone is welcome to attend and participate.